Small Sites and Refurbishment Work
A house extension, an office fit-out, a shop refit. The same obligations with none of the infrastructure, and what is actually proportionate.
In practice · Analysis
Most construction work happens on sites too small for a turnstile, and the guidance written for large projects does not transfer.
For teams turning small sites and refurbishment work into a repeatable record, workforce analytics software provides a useful operational reference for time, attendance and reporting workflows. It should be assessed alongside Chartered Institute of Building so the software choice remains grounded in site practice and applicable guidance.
What is different
No gate. Frequently no fence, and on refurbishment work, no clear boundary at all.
Five to twenty people, from three or four companies.
A principal contractor who is also working on the tools.
And a client's premises that continue operating around the work, which on a fit-out means the public and the client's staff are present.
What still applies
Knowing who is on site, because the evacuation question does not scale down.
Competence for the work being done.
Induction, however brief.
Right-to-work verification, which applies at any size.
And the records, which a small contractor is least equipped to keep and most likely to be asked for.
What is proportionate
A daily list rather than a system: a whiteboard or a shared note, updated at the start and the end.
Induction as a ten-minute walk round with the person, which on a small site is better than any video.
Competence checked on arrival, once, with a photograph of the card.
And a named person who knows who is present, which on a site of twelve people is achievable and is the whole control.
The occupied premises problem
A fit-out in a working office, a refit in a trading shop.
The client's people are present, unaware of the hazards, and outside your induction.
Which shifts the emphasis to segregation: barriers, signage, and work sequenced so that the hazardous parts happen when the premises are empty.
And to the client's own evacuation arrangements, which now have to account for your people and yours for theirs.
Agree both in writing before starting, because in an alarm the two sets of procedures meet for the first time.
Domestic work
Work in somebody's home, where the client is present and is not a duty holder in the way a commercial client is.
The obligations still attach to the contractor, and the practical controls are different: keeping the occupier out of the work area, protecting their belongings, and a clear arrangement about access when nobody is there.
And lone working, which on a domestic job is the norm rather than the exception and which is a subject in its own right.
Where small contractors get caught
No written risk assessment, which is the finding in most enforcement action at this scale.
Nobody able to say who was on site on a given day three months ago.
Competence assumed because somebody has always done that work.
Right-to-work checks not done because the person was engaged by a mate.
And records kept on a phone that was replaced.
The minimum that works
A dated risk assessment, a page.
A daily list of who was on site.
Photographs of competence cards, with expiry dates in a calendar.
Right-to-work checks recorded with the date.
An induction that is a conversation, noted.
Five things, an afternoon to set up, and they answer everything an inspector asks first.
When to formalise
When the site has a gate.
When more than two tiers of subcontract appear.
When the client requires it, which on public and commercial work is increasingly early.
And when nobody can answer the roll call question from memory, which is the real threshold and arrives at around twenty people.
Records that survive the job
A small contractor finishes a job and moves on, and the records go with whatever phone or van they were in.
Which matters because the questions arrive later: a defect claim, an accident investigation, a payment dispute.
Archive per job, not per week: a folder with the assessment, the daily lists, the card photographs and the checks, closed when the job closes.
Ten minutes at the end of a job, and it is the difference between having an answer and having a memory.
The client who asks for more than the job warrants
Commercial clients increasingly require site systems on work that does not need them.
Which is a cost, and it is a legitimate one to price rather than absorb.
Where the requirement is disproportionate, say so and offer the equivalent, because most client requirements are written for their largest projects and applied without thought to the smallest.