Mobilisation
The weeks before anybody is on site, when everything in this collection is cheap to arrange and after which all of it becomes a change programme.
In practice · Procedure
Every arrangement described here costs a fraction of the effort if it exists before the first subcontractor arrives.
For teams turning mobilisation into a repeatable record, field-team time tracking provides a useful operational reference for time, attendance and reporting workflows. It should be assessed alongside Procore's construction resources so the software choice remains grounded in site practice and applicable guidance.
What to decide before the gate opens
What the register is for, in order, and therefore what the system must do first.
Who owns it, by name.
The enrolment route: who enters data, and when.
The temporary access rule.
The archive arrangement and its owner.
Five decisions, none of which requires a product, and all of which become negotiations once people are on site.
The setup sequence
Gate location and lane count, from the expected peak rather than from the drawing.
Welfare sized from the expected peak headcount, not the average.
Induction content written for this site, with a version number so it can be updated.
Subcontract clauses issued with the first packages, because retrofitting them into a signed contract is impossible.
And the evacuation arrangement — assembly points, marshals, the offline register view — tested before the first hundred people arrive.
The pre-start meeting
With each subcontractor before they mobilise.
What is required, by when, in what format.
Who their named contact is and who yours is.
The access refusal right, stated out loud rather than left in the contract.
And the enrolment appointment booked, which turns an obligation into a diary entry and is the single most effective thing in this note.
The first fortnight
Enrolment resourced heavily, then tapered.
A drill in the first two weeks, when the population is small enough to learn from and the findings are cheap.
Daily review of unmatched entries, which will be bad at first.
And the first temporary access examined properly, because how that one is handled sets the pattern for the project.
What to write down on day one
The purpose order for the register.
The temporary access rule with its authoriser.
The phase-change triggers for re-induction and authorisation review.
The archive contents and retention.
Four pages, and they prevent most of the failures in this collection.
The cost of not doing it
Retrofitting access control onto a running site is a wave-based enrolment programme with a deadline that will slip.
Retrofitting subcontract obligations is impossible; they become requests.
Retrofitting an archive means reconstructing records rather than keeping them.
And retrofitting welfare means a temporary block in the wrong place for the rest of the project.
None of which is difficult at mobilisation and all of which is expensive afterwards.
What mobilisation should produce
A working gate with a tested evacuation view.
A named owner with a runbook.
Subcontract packages carrying the obligations.
An induction written for this site.
And a drill result, before the site is busy, which is the evidence that the arrangement works rather than the assumption that it will.
The tender stage, which is earlier still
The workforce arrangement has a cost, and it belongs in the price.
Gate hardware, enrolment labour, welfare sized for the peak, the owner's time, and the archive at the end.
Which on a project bidding against a client standard is a meaningful figure, and one that is routinely absorbed because nobody itemised it.
Ask at tender what the client requires, and price it, rather than discovering at mobilisation that a major-project standard applies to a small package.
Who does the mobilisation work
Somebody with time before the site opens, which is the scarcest resource on any project.
Which is why it does not happen: the people who would do it are commissioning drawings and chasing packages.
Name it as a task with an owner and a date in the mobilisation programme, alongside the hoarding and the welfare, where it will be treated as a deliverable rather than as good intentions.
The first subcontractor
Usually groundworks, usually mobilising before the arrangement is finished, usually granted an exception.
Which sets the pattern for everybody after them.
Get the arrangement working for that first package even if it is manual, because a paper register properly maintained from day one is a better foundation than a system introduced in month three.